Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Enter name of the new chart.
  2. Check Date interval if you need to restrict time period of displayed data - continue by Setting Date Interval.
  3. Select and edit Indicators displayed in the chart - continue by Displaying Indicators.
ilupng
tablechart-create

Chart management

You can perform additional operations in upper right corner of the inserted Chart view:

...

Info

When more Indicators are added to the chart, they are displayed in separate charts within the view by default. Display in the single chart option forces them to be grouped into single chart.

ilupng
report-chart-settings

Drill down path

...

Warning

Display Total Value option does not apply to Pie and Stack bar charts.

ilupng
chart-drill-down-chart

Members appearance

Serves for changing color, icon and translation for drill-down members. Note: These changes will affect all views and reports based on this data set and you should have editing permission for such data set to perform changes. See Members appearance and Attributes and members translation for details.

...

  • Specify Color theme and Title color
  • Separate to columns: You can specify to how many columns will be the charts displayed within the view, if there are more columns (default is one chart per row).Applicable for two or more indicators within one view.
  • Value range: You can override default lower and upper limits for displaying data on Y axis. Note: Both limits must be set at the same time.
  • Chart axis: Hide X axis, Hide Y axis
  • Members on horizontal axis: Applicable if drill-down and time dimension are set together. Date/time information are displayed on X axis by standard. Use this feature to display drill-down members on X axis instead (date/time information will be distinguished by legend).
  • Group values (available for ... charts)
  • Show values (available for ... charts)
ilupng
chart-appearance

Next steps

*Creating Geo Maps
*Creating KPI labels
*Setting Date Interval
*Displaying Indicators