Page History
Predefined drill-down path specifies the meaningful sequence might by useful for further drill-down operation in report (see attached video tutorial below). Each data set can contain more drill-down paths. The simplest drill-down path is linear, however BellaDati supports more complex structures like trees.
Info |
---|
Predefined drill-down paths are available int the report when performing ad-hoc drill-down (by clicking on + in the table), or in the drill-down settings. |
ilupng |
---|
DrillDownPath |
- Go to desired data set via data set menu.
- Select "Attributes" in the left submenu.
Info |
---|
Predefined drill-down paths significantly simplifies creating reports by analysts and performing drill-down operation in reports and on dashboards. Therefore we recommend defining these paths on the data set level. |
Adding new drill-down path
- Click "Add drill down path" at the bottom of the page. A popup will appear.
- Select first attribute in "Use attribute" drop-down box and click on "Save" button.
- Click the green plus icon on the right of existing attribute in drill-down path to add another attribute and repeat steps above to create whole drill-down path.
Note |
---|
By clicking on green plus icon in the middle of existing drill-down path, you can branch out current drill-down path to more sub-paths. |
Tip |
---|
You can create an new attribute during drill-down path definition by filling in the field "Add new attribute" in the popup. See managing attributes for details. |
Editing drill-down path
- Removing attribute: Hoover over the desired attribute, click on the right top cross symbol and confirm this action in popup.
Tutorial video
HTML |
---|
<div style="text-align: center"> <iframe width="640" height="360" src="http://www.youtube.com/embed/JqqYJv3M2uM" frameborder="0" allowfullscreen></iframe> </div> |